XXmaps.com

Map
Detailed Information
Openning hours
  • Monday 7:00 AM – 3:00 PM
  • Tuesday 7:00 AM – 3:00 PM
  • Wednesday 7:00 AM – 3:00 PM
  • Thursday 7:00 AM – 3:00 PM
  • Friday 7:00 AM – 3:00 PM
  • Saturday Closed
  • Sunday Closed
Photos
Ugljevik Power Plant
Ugljevik Power Plant
Ugljevik Power Plant
Ugljevik Power Plant
Ugljevik Power Plant
Ugljevik Power Plant
Ugljevik Power Plant
Ugljevik Power Plant
Ugljevik Power Plant
Ugljevik Power Plant
Reviews
Denis Mustabašić (Vandal) (08/31/2018)
.s
Milan Babić Babić (11/07/2019)
Significant production center of Elektroprivreda RS with installed capacity of 300 MW, which represents about 20% of the total electricity production in RS. It uses brown coal from the Bogutovo Selo mine as fuel. It is connected to the transmission system via three 400 KV transmission lines according to Tuzla, Sr. Mitrovica and Osijek and three 110 kV transmission lines.
Goran X (11/10/2019)
The collapse, starting from the CEO to the ordinary radnika.Najveci averse in Europe, the only question is how much longer it lasts.
Milenko Milenko (10/26/2019)
Because I'm an employee of TPP.
Mirza Ahmetbasic (07/21/2018)
It is unfortunate in what condition he was brought.