XXmaps.com

Map
Detailed Information
Openning hours
  • Monday 9:00 AM – 5:00 PM
  • Tuesday 9:00 AM – 5:00 PM
  • Wednesday 9:00 AM – 5:00 PM
  • Thursday 9:00 AM – 5:00 PM
  • Friday 9:00 AM – 5:00 PM
  • Saturday Closed
  • Sunday Closed
Photos
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
S-Power Energies, s.r.o.
Reviews
David Blahuta (02/03/2021)
My knowledge from the implementation of PV from S-Power. First of all, a sales representative who treated us with a great person, pleasant, impeccable dealings all the time pleasant. I must say that even in the implementation phase (although he did not have to and it was not even his job) he tried to solve the problems that I fixed about him. Unfortunately, this basically ended the pleasant thing. We have a very negative experience regarding assembly, which lasted completely unnecessarily for a disproportionately long time. Until we contacted, the quality of work, conditions on the construction site (tilted roof overnight (well and almost over the weekend), the construction supplied a smaller switchboard, electricians had to say how it should be connected back-up due to protectors and various other appetizers), but it was sometimes very very emotional and I would not want anyone to experience this. Everything has its pros and cons, of course there are certain reasons and nothing is black and white. Personally, I wouldn't go into it again, it wasn't really worth the nerves and worries. Especially not when you buy something turnkey like at this company and you have such worries about it. Unfortunately, this is the case and it has already happened. Now we are done, it is built, I am currently waiting for 3 months for the promised documents. Nothing extraordinary (sarcasm), only an inspection report, equipment documentation, wiring diagram (I have promised it for 3 months now) .... We had a larger number of workers (after the first complaint, the gentlemen then tried to fix everything, that's a big truth), not all negatives can be thrown at all, there were also very skilful people, unfortunately those who spoil it spoil it to everyone as a whole . So in conclusion. If you decide or have already decided for S-Power for PV, I wish you a great deal of luck for whoever comes to implement the power plant, and if you do not have it, at least strong nerves. (:
ANTONIN BOUSKA (12/09/2020)
Hello, I can only help but write a very positive evaluation. The installation of my power plant was accompanied by anomalies that perhaps cannot even be described. It did not happen during the whole time of trouble that the company S-POWER would try to get rid of responsibility and it would also cost big financial losses, which it completely covered from its own. that they will not make it to a successful end. In conclusion, I wish the company and all employees much success in the years to come.
Pavel Rusek (01/25/2021)
we are satisfied, FVE works as it should even in winter days, the application on the network is great, the mobile one is not so much, all questions from SCE employees are clearly explained, HMG is still observed - now we are waiting for the subsidy
Radek Varecha (01/23/2021)
S-power absolute satisfaction, the mall explains everything in detail, assembly to number one, the electrician managed even more complex distribution and small space, they also install a wallbox. Subsidies and all documentation for this under the direction of S-power. I can highly recommend.
Michel Samia (08/11/2020)
Despite the delay in processing the confirmation of the first parallel launch caused allegedly by changing some forms for EON, everything was done on time and the system works well. The subsidy also came within the declared 9 weeks of obtaining the confirmation of launch. The biggest advantage of S-Power is that in my chosen MIDI variant, asymmetric RCT inverters supply, which can use much more energy for my consumption from a given panel power than cheaper symmetrical inverters, because it can divide the power between phases according to the current load of individual phases. For the period January-August 2020, I produced 82.2% of consumed electricity. energy plus heating water from excess after charging the battery. The final savings figures will not be available for several months. But I can already see that I pay approx. CZK 300 instead of the previous approx. 1700 CZK.
Similar place