XXmaps.com

Map
Detailed Information
Openning hours
  • Monday 7:00 AM – 4:00 PM
  • Tuesday 7:00 AM – 4:00 PM
  • Wednesday 7:00 AM – 4:00 PM
  • Thursday 7:00 AM – 4:00 PM
  • Friday 7:00 AM – 4:00 PM
  • Saturday Closed
  • Sunday Closed
Photos
PT. Jawa Power
PT. Jawa Power
PT. Jawa Power
PT. Jawa Power
PT. Jawa Power
PT. Jawa Power
PT. Jawa Power
PT. Jawa Power
PT. Jawa Power
PT. Jawa Power
Reviews
dimas akib azmi (08/05/2019)
first time in history, August 04 11.44 AM electric down.
The Ceca (12/20/2015)
Very save place!
Aviv Putri Utami (02/26/2020)
ud83cuddf2ud83cudde8
Fauzi Dorayaki (12/05/2020)
JAWA POWER or better known as PLTU PAITON is a steam power plant located on the border of Probolinggo and Situbondo.nThis PLTU supplies electricity from Java to the Island of the Gods. We can immediately see the splendor and beauty of PLTU Paiton when crossing the Pantura route (Probolinggo-Banyuwangi) because the location is right on the edge of the highway.nAt night, it will look even more magnificent and cool because it is decorated with thousands of lights.
Sulhan Qumarudin (08/07/2019)
Paiton Steam Power Plant (PLTU). One of the biggest and most important power plants to supply electricity in Java and Bali. For the DIY and southern Central Java regions one of the sources of electricity is from the Paiton power plant. Don't let there be another blackout, PLN. Increase professionalism at work.
Similar place