XXmaps.com

Map
Detailed Information
Openning hours
  • Monday 7:00 AM – 6:00 PM
  • Tuesday 7:00 AM – 6:00 PM
  • Wednesday 7:00 AM – 6:00 PM
  • Thursday 7:00 AM – 6:00 PM
  • Friday 5:30 AM – 10:00 PM
  • Saturday 7:00 AM – 6:00 PM
  • Sunday 7:00 – 10:00 AM, 6:00 – 10:00 PM
Photos
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
A M U Swimming Club/University Games Committee
Reviews
ahmad yoosuf (12/24/2020)
Good, Quite large, Chilled, but.....nOnly for AMU students◖⚆ᴥ⚆◗ud83dude13
NAGENDERA PRATAP SINGH (01/08/2020)
One of the best swimming pool in Aligarh city....A swimming pool, swimming bath, wading pool, paddling pool, or simply pool is a structure designed to hold water to enable swimming or other leisure activities. Pools can be built into the ground (in-ground pools) or built above ground (as a freestanding construction or as part of a building or other larger structure), and are also a common feature aboard ocean-liners and cruise ships. In-ground pools are most commonly constructed from materials such as concrete, natural stone, metal, plastic, or fiberglass, and can be of a custom size and shape or built to a standardized size, the largest of which is the Olympic-size swimming pool.nnMany health clubs, fitness centers, and private clubs have pools used mostly for exercise or recreation. Many towns and cities provide public pools. Many hotels have pools available for their guests to use at their own leisure. Educational facilities such as high schools and universities sometimes have pools for physical education classes, recreational activities, leisure, and competitive athletics such as swimming teams. Hot tubs and spas are pools filled with hot water, used for relaxation or hydrotherapy. They are common in hotels and health clubs, and can also be found in many private homes. Special swimming pools are also used for diving, specialized water sports, and physical therapy, as well as for the training of lifeguards and astronauts. Swimming pools may be heated or unheated.
hashim Khan (03/16/2020)
also an historic building (swimming pool) of AMU, Aligarh.
Shahid Ali Mansuri (11/20/2020)
My old swimming pool
Munavvir K (05/26/2019)
The University received Rs. 5 (five) Crores from M/s Lulu Group Mr. Yusuff Ali M.A., a non-resident Indian for the construction of “Olympic Size Swimming Pool Complex”. The University (through Building Department, AMU) has signed MoU with the M/s MSYK Design (Architect/Consultant) on 25.08.2014 and the same architect was being engaged by PMC (Project Management Consultant) M/s New Millennium for OSSP project.nnThe Architect, M/s MSYK Design, New Delhi, took up Structural & Architectural Design Drawings of Swimming Pool Complex at the fee @ 2.6% + Service Tax and Travelling Allowance @ Rs. 5,000/- per visit.nnSubsequently, M/s New Millennium Pvt. Ltd. Delhi was appointed as Project Management Consultant (PMC) and MoU was signed between AMU Aligarh & M/s New Millennium on 04.08.2015 (w.e.f. 23.06.2015) as PMC to Develop a Swimming Pool in AMU. On the basis of design done by M/s MSYK Design, the PMC finalized the tender documents after compilation and finally Civil work, Electrical work and Plumbing work etc. were awarded to the contractor M/s DYNACON Projects Pvt. Ltd. Greater Noida (UP); an agreement was signed on 7th July 2015 between AMU & M/s DYNACON Projects for Construction / Development of Swimming Pool at AMU Aligarh. The tenders for Filtration Plant of Swimming Pool were also invited by the Project Management Consultant and opened on 17.08.2015. A Letter of Intent (LOI) was issued to M/s Candy Filters Delhi as L-1 vide Ref. No. 254/RCA on dated 07.09.2015 by the OSD Olympic Size Swimming Pool Project (OSSPP) for the bid price of Rs. 46.99 lacs.nnM/s New Millennium submitted revised estimate regarding Construction of Ground Floor & First Floor building, informed through mail to the OSD, OSSPP on dated 28.12.2015 for the Budgeted / Expected cost estimate of Swimming Pool for the amount of Rs. 725 Lacs.nnIn a meeting dated December 11-12, 2015 under the Chairmanship of the Vice-Chancellor, it was decided that the amount of Rs. 500 lacs donated by M/s Lulu Group shall be utilized for the construction of “OSSP and Sports Complex” for Boys in the main campus. Mr. Salman Jafri, PMC of the project, shared the comprehensive design of the “OSSP and Sports Complex” and desired that the project may be completed in totality since this is the last design project of Late Prof. M. Shaheer. The estimated cost of the work is 725 lacs. The Vice-Chancellor wished that additional funds may be identified and desired that Pro Vice-Chancellor may initiate action on this account. University may approach M/s Lulu Group with the progress of work and request them to sponsor additional amount for the extended work planned in sports complex with the recommendation for Financial & Administrative approval.nnHowever, M/s Lulu Group has also announced donation of Rs. 500 lacs for Swimming Pool for Girls in Women’s College and tenders invited for the construction of Swimming for Girls out of UGC funds of Rs. 225 lacs. It is expected that the remaining funds of Rs. 225 lacs will be utilized for this project once the funds will be provided by M/s Lulu Group.nnThe Building Committee of AMU in its meeting held on 26.07.2016, considered and approved the revised Estimates, plans and accorded Technical sanction as EX-POST FACTO. The committee recommended for the Financial and Administrative approval for the work of “Construction of Swimming Pool Complex of AMU” (Main building, Swimming Pool and filtration Plant, room, stands etc. complete work) for an amount of Rs. 725 lacs.
Similar place