XXmaps.com

Map
Detailed Information
Openning hours
  • Monday Open 24 hours
  • Tuesday Open 24 hours
  • Wednesday Open 24 hours
  • Thursday Open 24 hours
  • Friday Open 24 hours
  • Saturday Open 24 hours
  • Sunday Open 24 hours
Photos
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Kakrapar Atomic Power Station
Reviews
Riddhesh Sharma (07/22/2020)
CONGRATULATIONS SURTIES & MAJOR RESPECT TO INDIAN SCIENTISTS FOR ACHIEVING CRITICALITY
Abhishek Raj (03/17/2020)
Kakrapar Atomic Power Station is a nuclear power station in India, which lies in the proximity of the city of Vyara in the state of Gujarat. It consists of two 220 MW pressurised water reactor with heavy water as moderator (PHWR). KAPS-1 went critical on 3 September 1992 and began commercial electricity production a few months later on 6 May 1993. KAPS-2 went critical on 8 January 1995 and began commercial production on 1 September 1995. In January 2003, CANDU Owners Group (COG) declared KAPS as the best performing pressurised heavy water reactor.nKAPS-2 was shut down after a coolant channel leak in July 2015 and a similar issue forced the shutdown of KAPS-1 in March 2016. After a replacement of coolant channels and feeder tubes, KAPS-2 attained criticality in September 2018. Maintenance on KAPS-1 was completed ahead of schedule and was brought to operation on 19 May 2019.[2]nnThe construction costs were originally estimated to be ₹382.52 crore; the plant was finally finished at a price of ₹1,335 crore. Construction of units 3 and 4 started in November 2010.
chaudhari vishal (01/22/2021)
Atomic power station in kakarapar
Yash Patel (09/06/2019)
How much power produce in one day ?n......mw
Hitesh Gandhi (09/26/2019)
Very good ... neat and clean and safe....
Similar place